Adria Mobil – Slovenia

Project statistics

Comfortable working conditions for employees

Greatly improved productivity on hot days

Situation before the contract and client requireme

The client had no built-in comfort cooling in the production hall and used natural gas to heat the production hall.

Required cold: 460 MWh annually.

Required heat: 510 MWh annually.

The client wanted the highest level of savings.

Resalta solution

Analysis of the existing ventilation system and preparation of an energy efficient solution: reversible air/water cooling unit with integrated hydraulic module and high efficiency.

A reversible high efficiency heat pump was installed with a cooling capacity of 310 kW and a heating capacity of 340 kW (under Eurovent conditions).

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.