Slatina CHP – Croatia

Project statistics

15 new jobs created at the plant

Clean, cheap and efficient energy for the municipality

40

GWh

of electricity produced annually

Situation before the contract and client requirements

The Slatina project was launched to build a cogeneration heat and power plant that runs on biomass. It will be located in the northern part of Croatia in the Slatina municipality. 

The parcel on which the facility will be built is situated outside the city of Slatina on the building plot with the cadastral number 819/6, in possession of the company Energy 9. 

Resalta solution

Resalta will build a 5 MW cogeneration plant in Slatina. The plant includes a woodchip dryer. 

Slatina has signed a 14-year PPA with HROTE (Croatian electricity off taker). The project includes the electricity interconnection with a transmission system operator. 

A long-term supply contract for biomass has been signed with Hrvatske Šume for 14 years. 

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.