Gorenje/Lighting – Slovenia

Project statistics

Reduction of electricity use for lighting by

66

%

283

t

annual reduction of CO2 emissions

Situation before the contract and client requirements

Gorenje had old and damaged luminaires and the light flux level did not conform to industry standards and norms. As a result, the lighting needed to be replaced. 

The client was looking for an opportunity to realize savings without major investments. Before reconstruction, the average age of the luminaires  exceeded 20 years.

Resalta solution

Reconstruction of the lighting system, installation of highly efficient fluorescent luminaires, metering protocols and intelligent dimming systems in six industrial halls. 

Lighting systems in all industrial halls were totally reconstructed in two phases. 

In addition to financial savings, Resalta will also provide maintenance for the duration of the contract which will allow the lighting system to operate in optimal conditions.

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.