Gorenje/CHP – Slovenia

Project statistics

Annual savings

60,000

517

t

reduction of CO2 emissions

Situation before the contract and client requirements

Gorenje’s facilities in Velenje were using natural gas cogeneration (CHP) units for heat energy supply with 880 kW of combined heat power and 654 kW of electrical power. 

The required heat was 31,420 MWh annually, with an estimated 4,000 annual operating hours of the CHP.

Resalta solution

Integration of the right size of cogeneration (CHP) on natural gas; 850 kW of electricity and 929 kW of thermal power.

Resalta monitors the system through Resalta‘s central control system (web access) in real time, operating and maintaining the plant, also selling heat and electricity to the client.

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.