Medvode Neighbourhood – Slovenia

Project statistics

Annual savings

20,000

Combined heat and power

Situation before the contract and client requirements

A neighbourhood in the town of Medvode was using a natural gas boiler for heating several blocks of buildings. 

The required heat was 810 MWh annually and the heating costs were too high for the neighbourhood.

Resalta solution

Resalta analyzed the actual heating energy demand and installed an appropriately-sized cogeneration of heat and power (CHP) plant on natural gas. 

Resalta installed a CHP unit with a 50 kW electricity capacity and 80 kW of thermal power capacity. 

Resalta is maintaining the plant and monitors the system through GGE‘s central control system (web access) in real time.

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.