Hotel Histrion – Slovenia

Project statistics

Supplied heating energy costs reduced by

69

%

Total heating costs reduced by

17

%

Cooling costs reduced by

37

%

Situation before the contract and client requirements

The hotel used two chillers with a combined power of 590 kW, with a 4-way piping system, for cooling, and for heating a boiler with extra light fuel oil.

The entire existing cooling and heating system was obsolete and the hotel was incurring high costs of energy.

During works, the hotel had to operate without interruptions. 

Resalta solution

Resalta replaced two old chillers with one reversible heat pump (air/water), 590 kW capacity with an integrated hydro module. 

In summer time the heat pump covers all the cooling demand, in winter time it is the primary heating source in combination with boilers. 

The existing boiler room was reconstructed to retain the existing system for peak demands. 

Resalta provides energy supply of cold and heat. The whole system is connected to Resalta‘s central control system.

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.