Gorenje/CHP 2 - Slovenia

Project statistics

Annual savings:

250,000

EUR

Energy efficient system with increased reliability

Situation before the contract and client requirements

  • Analyses performed as part of the energy audit of Gorenje by Resalta have shown that the process and space heating systems could be improved with the addition of a new cogeneration unit with a thermal input and electrical power of around 1 MW.
  • Due to the requirement for exceptionally high temperatures in the production process, the cogeneration unit had to be specially designed and heat removal adapted accordingly.

Resalta solution

A new CHP unit with thermal capacity of 983 kW, and electrical power of 999 kW was installed. The unit will provide heat for the technological process, which will provide Gorenje with a more reliable heat supply.

Resalta has also devised investment documentation to enable a successful application for entering a support scheme. The unit will operate 4,000 hours annually but has the capacity to operate for 7,000 hours if necessary.

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.