Hotel Otrant - Montenegro

Project statistics
195

MWh

annual electricity savings

96

t

of CO2 reduced each year

Situation before the contract and client requirements

The hotel was using electricity to heat sanitary water, which was an expensive and inefficient heating method.

The maintenance of electric heaters was very expensive.

The client was looking for a contracting partner with experience in energy solutions for the hospitality industry. 

Resalta solution

 

Resalta installed an air/water heat pump for the heating of sanitary water. The heat pump capacity is 140 kW. The heated sanitary water is delivered to the main hotel building and the surrounding bungalows. 

 

The heat pump is located outside the area accessible to guests in order to avoid noise pollution and is connected with pipes to the tanks of hot sanitary water. 

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.