Hotel Salinera

Project statistics

Reduction of heating costs by

37

%

500

t

annual reduction of CO2 emissions

Situation before the contract and client requirements

The hotel was facing high energy expenses and an obsolete heating system that needed to be renovated; it needed to operate without interruptions.

The client was looking for a contracting partner with experience in energy solutions and financing.

Resalta solution

Resalta undertook a hydraulic reconstruction of the existing boiler room and installed a reversible heat pump sea water/water. This was connected to the existing pumping station and in addition new pipe connections were installed between the heat pump and the boiler room.

Resalta signed a contract for the energy supply of cooling and heating energy to the client.

Повече информация?

Свалете подробности за осъществени проекти.

Общи правила и условия.

Абонирайки се за нашия бюлетин, се съгласявате да получавате на електронната си поща съобщения от Резалта д.о.о. Целта на бюлетина е да информира посетителите на интернет страницата ни, нашите партньори, клиенти и широката общественост за дейността на Резалта, новите ни проекти, развития, предстоящи събития, както и новини във връзка с енергийната ефективност и възобновяемите източници. Публикуваме бюлетина най-често веднъж месечно, като са възможни изключения при непредвидени, но важни новини. Запазваме си правото да променим или спрем да издаваме бюлетина по всяко време и без предварително да ви информираме. Поверителността на вашата информация е много важна за нас и никога няма да я предоставим или продадем на трети страни. Имате възможност да прекратите абонамента си за бюлетина по всяко време.